Slant Mobile

Civil Construction | Federal Construction | Government and Municipal

Pine Creek, Vault Toilet & Dock Anchorage

Click to enlarge

Stryker & Company replaced the outdoor toilet building and stabilized the dock anchoring system at Pine Creek in Black Canyon of the Gunnison National Park for the National Park Service. The project required removing 2,200 gallons of septic waste by hand, sandblasting and recoating the septic tank, and rebuilding the dock system to withstand fluctuating water flows from the Blue Mesa hydroelectric dam, all at a remote site accessible only on foot.

What Made This Project Different

  • Removed 2,200 gallons of septic waste in 5-gallon buckets into 200-gallon totes, flown out by helicopter
  • Sandblasted and polyurea-coated the septic tank to extend its service life
  • Built a new pressure-treated and Trex deck with galvanized handrails and replaced the toilet
  • Stabilized the dock anchoring system, concrete anchors, new galvanized cables, and a 30-foot galvanized stabilizing arm, to handle fluctuating flows from the Blue Mesa hydroelectric dam
  • Every workday required hiking down 276 steps to the remote site, with materials and demolition debris moved by helicopter
Owner Icon

Owner/Client

National Park Service

Location Icon

Location

Cimarron, CO (Black Canyon of the Gunnison National Park)

Year Completed Icon

Year Completed

2022

Type Icon

Type

Site Work

Size Icon

Size

N/A

Owner Icon

Budget

N/A